top of page
Image by Guillermo Diaz

Valmont Industries Projects

San Francisco, California

DELIVERY METHOD:

CMAR

MARKET:

Building

SUB MARKET:

Manufacturing / Industrial

Valmont Training & Welcome Center consists of a 41,520 SF addition to an existing building on the Valmont Valley campus. The building features a 1,000 SF main lobby/display area, as well as several high-tech classrooms, breakout areas, an irrigation training room, a recording studio, an auditorium, and a cafeteria on the first floor, while the second floor is devoted to office space. It consists of a canopy over the main entrance, large 7,400 SF training classrooms, a 1,600 SF auditorium, 8,855 SF of office space, and a small kitchen. The exterior of the building consists of ribbed metal panels and glass.

Image by Jakub Pabis

The Waverly Expansion consisted of constructing a new 25,000 SF pre-engineered metal building addition to house Valmont’s expanded irrigation gear-box manufacturing division. The new addition ties into an existing specialized production building onsite. Key features within the new plant include a loading dock, bulk-oil and compressor lean-to building, and a shipping/ receiving office. Also included in the project is a new 4,000 SF office building to house Valmont’s existing employees, with room for growth.

logo
  • Instagram
  • Facebook
  • Twitter
  • LinkedIn
  • YouTube
  • TikTok

Contact Info

1515 S Federal Hwy, Ste 205

Boca Raton, FL 33432

(800) 316-0565

Copyright © 2025. All Rights Reserved by Koriledge Construction, Inc - PRIVACY POLICY

bottom of page